Is there a method for saving the Monte Carlo analysis results so that I do not have to repeat it each time I want to reveiw the results?
Barry
-
- Posts: 1018
- Joined: Wed Nov 09, 2005 9:55 am
RiskyProject does not save all results to project file (*.alm) because amount of data is huge. Results of calculation include samples for each task, each parameter (duration, cost, start and finish time) and each iteration. Currently you may export results to other software, such as MS Project, Excel, etc. You may also print results or export charts to different graphical formats (such as JPEG and BMP).
In version 3.0, which is coming this year, we will have an option to save results. In addition to it we will maintain multiple baselines, the same way as it is done in MS Project. It will be possible to convert results of calculation to the baseline.
In version 3.0, which is coming this year, we will have an option to save results. In addition to it we will maintain multiple baselines, the same way as it is done in MS Project. It will be possible to convert results of calculation to the baseline.
Intaver Support Team
Intaver Institute Inc.
Home of Project Risk Management and Project Risk Analysis software RiskyProject
www.intaver.com
Intaver Institute Inc.
Home of Project Risk Management and Project Risk Analysis software RiskyProject
www.intaver.com
-
- Posts: 1018
- Joined: Wed Nov 09, 2005 9:55 am
In current RiskyProject version 2.1 you may export results for a complete project, each phase, or each separate task. Results include statistical summary, samples, and charts (frequency, cumulative probability, and their combination). To perform this export right click on the frequency or cumulative probability chart. For full projects these charts are presented within project summary view. For separate task these charts are presented when you double click on each Gantt bar. If you export results for a particular phase use a summary task or a milestone, associated with this phase. In current version you cannot export statistical data for all tasks at the same time, because it may be very confusing for the large schedules.
You may also export results to other applications, such as MS Project. Please note that it will be mean results, as MS Project does not accept any statistical data. After the export schedule based on results of RiskyProject analysis will become original schedule in MS Project and can be used as a baseline.
You may also export results to other applications, such as MS Project. Please note that it will be mean results, as MS Project does not accept any statistical data. After the export schedule based on results of RiskyProject analysis will become original schedule in MS Project and can be used as a baseline.
Intaver Support Team
Intaver Institute Inc.
Home of Project Risk Management and Project Risk Analysis software RiskyProject
www.intaver.com
Intaver Institute Inc.
Home of Project Risk Management and Project Risk Analysis software RiskyProject
www.intaver.com