ConstraintsConstraints are limitations that you set on tasks. For example, you can specify that a task must start on a particular date or finish no later than a particular date. In RiskyProject, you can assign one of four constraints to a task:
Summary tasks have only “As soon as possible” and “Start no earlier than”. Use the General tab of Task Information dialog box to add or modify constraints. If you set a constraint to Start Not Early Than, an additional edit box opens in which you set the date for this constraint. If you assign a constraint other than As Soon As Possible, the background color for low, base, and high Start Times or low, base and high Finish Times changes to orange and the icon next to the task name has a red dot added to indicate that the constraint is other than As Soon As Possible.
When a
task has a constraint other than As Soon as Possible, it may not
shift due to the nature of Monte Carlo calculations, even if
predecessors have risks and uncertainties. Therefore, use caution
when planning to perform probabilistic calculations with
constraints. See also |