Field Descriptions
Tasks
Actual Income
Actual Cost
Display
Tracking Chart Checkbox
Task Duration Low - current
schedule
Duration High
Duration High Result
Task Duration Low -
current schedule
Task Duration Low -
Results
Duration Mean Result
Duration Mean
Statistical Result
Effort Driven
Task check box
Finish Time High
Result
Finish Time
High Result
Finish Time Low
Result
Finish Time
Low Result
Finish Time
Mean Result
Finish Time of
Task (Base)
Fixed Cost Accrual
Fixed Cost - Base
Fixed Cost - High
Fixed Cost - Low
Ignore
Resource Calendar
Income Accrual
Income Base
Income High
Income High Result
Income Low
Income Low Result
Income Mean Result
Milestone Check box
Notes
Percent Completed
Present Task on the
Risk Chart
Present Task
on the Risk Chart
Resource Cost Base
Resources
Revenue Base
Revenue High
Revenue Low
Revenue Mean
Seed for
Monte Carlo Simulation Duration
Seed for
Monte Carlo Simulation Fixed Cost
Seed for Monte
Carlo Simulation Income
Seed for
Monte Carlo Simulation Start Time
Sensitivity
Coefficient Cost
Sensitivity
Coefficient Duration
Show Risk
Table Flag
Start Time High
- resultg
Start Time Low -
result
Start Time Mean
- result
Start Time Task
Base
Start Time Task
High
Start Time Task
Low
Statistical
Distribution for Duration
Statistical
Distribution for Fixed Cost
Statistical
Distribution for Start Time
Success Rate
Task Name
Total Cost (Base)
Total Task Cost High
- result
Total Task Cost Low -
result
Total Task Cost Mean
- result
Work Base -
cur. schedule
Work High -
cur. schedule
Work High Result
Work Low -
cur. schedule
Work Low Result
Work Mean Result
Resources
Base Calendar
Draw chart
Material label
Maximum units
Actual Income
Resource
description
Resource
Initials
Resource Name
Show Risk
Table Flag
Standard Rate
Type
Risk
Risk
Assigned to Task/Resource
Chance that risk
will occur
Color for
probability wheel
Distribution
Distribution
Chart
Finish time
of the risk occurrence
Most likely
time of the risk occurrence
Outcome of the risk
Result of the outcome
Risk Alternative
Risk Description
Risk Enabled
Risk Impact
for Cost
Risk Impact
for All Parameters
Risk Impact for
Duration
Risk Mitigation
Plan
Risk Name
Seed for outcome
Seed for outcome
Start time of
the risk occurrence
Sensitivity
Impact
(current schedule)
Impact
(Post-mitigation)
Impact
(Pre-mitigation)
Note
Opened or
closed risk
Parameter Name
Parameter Type
Probability
(current schedule)
Probability
(Post-mitigation))
Probability
(Pre-mitigation))
Risk
Assigned to Task/Resource
Risk or Issue
Score
Current Schedule
Score
(Post-mitigation)
Score
(Pre-mitigation)
Sensitivity
Chart
Sensitivity
Coefficient
Show risk
on the matrix
Task ID
Threat
or opportunity (current schedule)
|